blog posts
Milltek OPF replacement pipe V1 for Porsche Boxster 718 GTS 4.0 (with OPF) from 2020 (Type 982)
Sale price
€1.086,36
Regular price
€1.143,54
Save €57,18
Tax included
Vehicle model
Porsche 718 Cayman · Typ 982 from 2016
Check exact engine and model years in the description ↓
Vehicle data
Milltek Sport
Milltek OPF replacement pipe V1 for Porsche Boxster 718 GTS 4.0 (with OPF) from 2020 (Type 982)
Sale price
€1.086,36
Regular price
€1.143,54
Save €57,18
Tax included
Description
Milltek OPF Replacement Pipe V1 for Porsche Boxster 718 GTS 4.0 (with OPF) from 2020 (Type 982)
Suitable for:
- Porsche Boxster 718 GTS 4.0 (with OPF) 2020-2024 (Type 982)
Scope of delivery:
- 2x OPF Replacement Pipe
Technical data
- EC-approval: No
- Pipe diameter: 70 mm
- for OE and Milltek sport exhaust system from particulate filter - Requires Stage 2 software
- SSXPO170
Does it fit my car?
We completely understand if you are unsure if a part is compatible with your car, so we strongly recommend you contact us here with your query and our friendly sales team will then be in touch to confirm if this part is the correct part you are looking for.
Manufacturer
customer information
Important customer information on approval and intended use
At GG2 Fahrzeugtechnik, we distinguish between motorsport products and components supplied with approval documents. Whether a product may be used on public roads depends on the specific product, vehicle, applicable conditions and the rules in the country of registration.
- Products with TÜV/ABE/ECE documentation: Please observe the scope and all conditions in the relevant documents. Depending on the product and vehicle, an inspection, registration entry or further approval may be required before road use. A parts certificate does not automatically permit use on public roads.
- Motorsport / Export: Observe the restrictions stated for products explicitly marked for motorsport use only or not approved for public-road use. If no clear approval information is provided, please contact us before purchase and clarify the applicable requirements with the relevant inspection body or authority before installation or use.